6 Min Read
How Long Does a Kitchen Remodel Take on Long Island?
If you’re planning a kitchen remodel on Long Island, one of the first questions on your mind is probably: “How long is this going to take to redo a kitchen?” And it’s a fair question. Whether you’re doing a simple update or a full redesign, the kitchen is, arguably, the center of your home. You don’t want it out of commission any longer than necessary.
We specialize in kitchen remodeling Long Island homeowners can trust: timely, transparent, and tailored to your lifestyle. In this post, we’ll break down the full kitchen remodel timeline, what you should expect at each phase, and how to keep your project moving smoothly.
Average Kitchen Remodel Timeline on Long Island
The truth is, kitchen renovations in Suffolk County and across Long Island vary in length depending on size, design choices, and layout changes. A well-planned remodel can take as little as 6 weeks, while more complex jobs may stretch to 12 weeks or more. Add in time for planning, design, and permitting, and you’re looking at an average timeline of 3 to 5 or more months from start to finish on Long Island.
Smaller projects, like updating a small kitchen or leaving the layout untouched, often finish closer to the 8-week mark. Full gut remodels, layout reconfigurations, or custom material selections can push your kitchen remodel timeline into the 3 to 5 or more months range.
The key takeaway? The more you plan up front, the smoother (and faster) the job runs. And when you’re working with an experienced team like Long Island Creative Contracting, Inc. you know you can trust us to keep you updated every step of the way.
How Long Does It Take to Remodel a Small Kitchen vs. a Large Kitchen?
When it comes to kitchen renovations, size definitely matters. The timeline for remodeling a small kitchen is usually shorter and more straightforward, but that doesn’t mean it’s always easy. Here's how the scope affects the schedule:
Small Kitchen Remodel
If you're updating a small kitchen without changing the layout, it's typically 4 to 6 weeks of construction, plus 2 to 3 weeks of planning and design. These projects often involve replacing cabinetry, countertops, flooring, and appliances, but without major plumbing or electrical work.
Galley kitchens or compact L-shaped layouts can move fast, especially if you choose in-stock materials and keep the design simple. This is ideal for homeowners who want a refreshed space without the downtime of a full gut.
Large Kitchen Remodel
For larger kitchens, especially ones involving layout changes, wall removal, or high-end custom design, you’re likely looking at 8 to 12 weeks of construction or more. Bigger kitchens take more time to demo, require longer install periods for cabinetry and countertops, and often need complex plumbing, electrical, or HVAC updates.
These projects also tend to involve more decision-making during the design phase, more inspections during rough work, and longer lead times for custom materials.
Key Takeaway:
- Small kitchen remodels have a faster timeline, often lower cost, but are limited in layout options.
- Large kitchen remodels can take more time, have more flexibility, and could have higher potential value.
Whether you’re working with 300 square feet or 1,200 square feet, we help you set realistic expectations and a timeline that works for your lifestyle.
Key Phases of a Kitchen Remodel Timeline
When you’re planning a kitchen remodel on Long Island, knowing what to expect at each phase helps you stay on track and avoid delays. At Long Island Creative Contracting, Inc., we follow a proven process built around honest estimates, transparent timelines, and clear communication.
Here’s the full breakdown of your kitchen remodeling timeline, step by step:
1. Initial Consult and Estimates
We begin with a call and an appointment to discuss your goals, layout, must-haves, and investment range. From there, you’ll receive a detailed, written kitchen remodel estimate that sets the stage for the entire project.
2. Design and Selections
Now we get into layout changes, cabinetry options, appliance placement, and finish selections. Our Long Island kitchen design team collaborates with you and our architects to create a design that suits your lifestyle and budget. Whether you’re going high-end or keeping it clean and functional, we guide you through every choice.
3. Permitting and Material Ordering
Once your design is approved, we handle permit applications with your town or village. This process varies depending on where you live in Suffolk County or Nassau County. At the same time, we order your cabinets, appliances, and fixtures to lock in your timeline.
4. Demolition
The old kitchen comes out. Cabinets, counters, flooring, and walls, or whatever’s part of the renovation, get cleared. Wondering how long it takes to demo a kitchen? Most tear-outs take less than a week, but we prep everything so there are no surprises when we get started.
5. Rough Construction
This is where the real work starts: electrical, plumbing, framing, HVAC, and any layout reconfigurations happen now. Inspections are done along the way to meet code requirements.
6. Finish Construction
Cabinetry is installed, countertops are templated and fitted, appliances are connected, and the flooring, backsplash, and lighting are wrapped up. We also complete the final paint and finish work so everything looks showroom-ready.
7. Final Walk-Through and Project Wrap-Up
Once the work is complete, we schedule a final review with you. We walk the space, make sure everything meets your expectations, and knock out any last punch-list items. What will your kitchen look like after the walk-through? Here is some of our past work to get you excited about the possibilities.
What Can Delay Your Kitchen Remodel?
Even with the best planning, there are a few common factors that can slow down your kitchen remodeling timeline. Knowing these upfront helps avoid frustration and surprises.
Permit Delays
Every town in Suffolk and Nassau County has its own rules and review times. If you're changing the layout, moving plumbing, or opening walls, you’ll need permits. We handle this for you, but the local approval timeline can vary.
Material Lead Times
Choosing high-end finishes or custom cabinetry? Great taste, but it may come with wait times. Backordered appliances, unique tile, and specialty hardware can add weeks to your kitchen remodel schedule. Want to stay on track? Finalize selections early.
Design Changes
You start by saying, “Let’s just update the cabinets,” but halfway in, you want new windows, flooring, and a skylight. These changes add time, so we help you set clear expectations from day one.
Unforeseen Issues
Especially in older homes, we occasionally uncover surprises: old plumbing, outdated electrical, and water damage. We’ll fix it right, but it may extend the kitchen remodel timeframe.
The Best Time of Year to Remodel Your Kitchen
Timing your project right can make a big difference in how long your kitchen renovation takes. So what’s the best time to remodel a kitchen on Long Island? A lot of it depends on when you can afford not to use your kitchen for a while. You can certainly still live at home while a kitchen remodel takes place, but you won’t have access to all of your normal cooking tools.
Winter and Early Spring
This is prime time. Fewer homeowners remodel during winter, which means kitchen contractors on Long Island may have better availability. You’re also less likely to face delays from material shortages or overbooked trades.
Spring and Summer
Popular but busy. Demand spikes during warmer months, especially for large Long Island kitchen renovations or projects paired with other home remodeling on Long Island. Booking early is key.
Our Advice
Plan your remodel early. That gives you time to find your remodeler and start and finish your remodel by the time you really need your updated kitchen.
How Much Does It Cost to Remodel a Kitchen on Long Island?
Just like your timeline, your kitchen remodeling costs can vary greatly based on a number of factors, including scope and the current state of your kitchen. Luckily, we’ve created a Kitchen Remodeling Cost Guide just for you. Do you still have questions? Don’t worry, we have answers.
Why Long Island Creative Contracting, Inc. is the Right Choice for Your Kitchen Renovation
At Long Island Creative Contracting, Inc., we’re not just about swinging hammers. We’re about building trust, clarity, and kitchens that last. With over 30 years in the industry, we’ve completed hundreds of kitchen remodels in Suffolk County and across Long Island, helping homeowners design smarter, budget better, and actually enjoy the process.
Here’s what sets us apart:
- Transparent Planning: You’ll get detailed kitchen remodel estimates.
- Expert Design: Our team knows Long Island kitchen design inside and out. We blend form and function to create kitchens that reflect your lifestyle.
- Streamlined Process: From demo to final walk-through, your dedicated project manager keeps things on track.
- Daily Communication: You’re never left in the dark. We check in, keep you updated, and adjust as needed.
Start Planning Your Long Island Kitchen Remodel Today
So, how long does a kitchen remodel take? Now you’ve got a clear picture and a proven process to back it up. Whether you’re remodeling a small galley kitchen in Huntington or opening up a luxury space in Port Jefferson, the timeline depends on your scope, choices, and who you hire.
With Long Island Creative Contracting, Inc., your project stays organized, on schedule, and true to your vision. Ready to get started? Let’s build the kitchen you’ve been waiting for while increasing your home value at the same time.
Contact Long Island Creative Contracting, Inc.
Are you ready to get the kitchen of your dreams? Do you have more questions about kitchen remodels on Long Island? Contact us today to schedule a consultation or to learn more.